Supply of water treatment devices and pumping stations for the Katowice-Pyrzowice Airport

GENERAL INFORMATION

Location: Katowice – Pyrzowice Airport

Ordering Company: Katowice City Hall

Date: 2014

PROJECT DESCRIPTION 

The project included the following tasks:

  • construction of a new 3200 m long runway
  • converting a runway into a taxiway
  • extension of parking aprons

Target:

modernization of 39 thousand m² of taxiways allowing aircraft of the size of a Boeing 747 to move between the runway and the parking plane (15 stands for aircraft)
thanks to the investment, by 2016, over 357 thousand sq m will be created at the Pyrzowice airport m² of new airport pavements, and 156.5 thous. m² will be rebuilt.
As part of the project “Expansion and modernization of airport and port infrastructure”, Ecol-Unicon designed and implemented a task aimed at pre-treatment and pumping rainwater from three airport catchments.

APPLIED SOLUTIONS
Ecol-Unicon designed, delivered and installed 3 pre-treatment systems consisting of 4 technological lines with sewage pumping in 3 airport catchments (A, B, C)

In total, the following were delivered:

  • 12 separation chambers (3 x Ø 2000, 3x Ø2500, 3x Ø3000, 3x tank 4600×2000)
  • 16 two-chamber vortex settling tanks EOW-2 delivered in wells with diameters of Ø 3000 and Ø 2000
  • 12 lamella separators supplied in Ø 3000 diameter wells
  • 3 sewage pumping stations installed in tanks with a diameter of Ø 5600. The pumping station from catchment A was designed for flow: 280 dm3 / s, from catchment B: 440 dm3 / s and from catchment C: 340 1 dm3 / s