Supply of water treatment devices for the investment in Chojnice

GENERAL INFORMATION

Location: Chojnice

Ordering Company: MAZUR – Specjalistyczne Przedsiębiorstwo Robót Inżynieryjnych Mazur Henryk

Date: 2020

PROJECT DESCRIPTION 

Construction of rain collectors. Pre-treatment systems in concrete tanks. Installation with lamella separators and sedimentation tanks. Control system for overfill, oil and sludge alarm sensors with GSM model, solar powered.

Delivery, assembly and start-up of two large double pre-treatment systems:

lamella separator ESL-Z 560/5600 pieces 4:

  • separator chamber dimensions 6000 mm / 4500 mm,
  • nominal capacity of the system 560 l /s,
  • maximum capacity 5,600 l /s,

two-chamber vortex settling tanks EOW-2 pieces 4:

  • diameter of the first chamber: 6000 mm,
  • diameter of the second chamber 3000 mm,
  • nominal capacity of the system 560 l /s,
  • maximum capacity 5,600 l /s,
  • capacity of the sediment section 104 m3,
  • permissible height of the sediment layer 54 cm.

Delivery, assembly and start-up of two small double pre-treatment systems:

lamella separator ESL-Z 100/1000 pieces 2:

  • separator chamber dimension 2500 mm
  • nominal capacity of the system 100 l /s,
  • maximum capacity 1000 l /s,
  • actual capacity of the sedimentary part 790 dm3,
  • 1950 dm3 oil storage capacity.

two-chamber vortex sedimentation tanks EOW-2 100/1000 pieces 2:

  • diameter of the first chamber 2500 mm,
  • diameter of the second chamber 1500 mm,
  • nominal capacity of the system 100 l /s,
  • maximum capacity 1000 l /s
  • capacity of the sediment area 8.7 m3,
  • permissible height of the sediment layer 52 cm,
  • single pre-treatment system EOW + ESL-Z 40/400.

Overfill, oil level and sediment alarms with GSM modem have been installed in the systems. The whole is powered by 4 triple solar systems.